SKU
43463

Balboa GS100 with 2.0kW Heater and Mini Oval Topside

Grouped product items
Product Name SKU MPN Price Qty Stock
Balboa Heater M7 (For new GS100) - 10 inch - 2KW Balboa Heater M7 (For new GS100) - 10 inch - 2KW 43026 58201-01
£139.94 £116.62
- +
2 In stock
Balboa GS100 Control Box (New Style) - 2kw Balboa GS100 Control Box (New Style) - 2kw 21195 56461-03
£215.89 £179.91
- +
Available for
Back Order
Balboa VL200 Topside Control Panel with Overlay Balboa VL200 Topside Control Panel with Overlay 4321 53238
£106.94 £89.12
- +
18 In stock
Add to Wishlist

In-stock orders dispatched:14:00

This hot tub system comes complete with the Balboa spa GS100 control pack, an M7 2kW heater and the VL200 topside control panel.

M7 Features

  • Sensors: M7 24" x 2
  • Required flow rate: 21gpm
  • Flow detection: M7 Technology by using a sensor at either end of the assembly

Topside Features

  • LCD Displays
  • Large, easy-to-read displays
  • Reliable communication interface
  • Maintenance reminders & alerts
  • Water-resistant connectors
 

GS100 Control Box: (L) 190mm x (H) 137mm x (D) 60mm (main plastic unit only)

Heater M7: Length: 260mm , Diameter: 50mm / 1.5inches , Distance Between terminals: 30mm , Complete length (inc. unions): 375mm

Topside: Width: 110mm (4.3") , Height: 40mm (1.6")

  • Volts: 230vac / Hz: 50
  • Specification: Pump 1: Two-speed
  • Heater: x 1 2kW (included)
  • Ozone: x 1
  • Light: x1

Compatible with: Mini or Duplex panel such as VL200 (supplied in this package), 240,260 or VL401,402,403,404.

Topside Installation

To determine the correct topside for your application: a) space required to fit the new topside when removing old topside and the hole into which it fits (the topside links take you to the topside page where there are schematics of hole fitment) b) your system output set up. 

We have produced a generic step by step guide for fitting your new topside here

Due to the vast array of sealants in the marketplace we only recommend using Silcoset Silicone Sealant - the industry leader

 

Amp cables plug into the PCB to operate the components

If upgrading from an even older system or a different manufacturer, typically the process is the same, but, you will probably have to convert your old cables (typically JJ plugs) over as this box uses plastic amp plugs to connect to the circuit board, from all internal components i.e. pumps, ozone & blowers.

An example of what you will need is:

1 x 4 pin cable (2 speed pump)
2 x 3 pin cable (1 speed pump, blower or ozone)
1 x 2 pin cable (Spa light)

You have your existing cables so these are not supplied with the packs, you typically just need some AMP plugs and the AMP chrimps.

This GS100 Control Box is an entry level system. It has a small and easy to mount and set up the control box with a separate remote heater, 2 dip switches allow you to program time out functions for both speeds of the pump via. This unit must be fitted by a competent individual or tradesman.

The Heater M7 comes with 1.5" connections.

Please note, the topside size and configuration we send you will be as per the photograph, but sometimes the overlay design and colour may vary, this has no bearing on functionality & installation

Icon Label Type Size Download
pdf GS100 overview pdf 1 MB Download
pdf GS100 tech sheet pdf 387.1 KB Download
More from Balboa
Need Help?